A brand founder presenting a product sample to a retail buyer across a table covered with samples and printed sheets.
October 12, 2026

Fund Your First Retail PO With a 13 Week Cash Flow

A first national retail PO creates a cash gap. Build a 13 week cash flow to plan slotting fees, production, freight, and payment terms first.

8 min read

By TJ Bredemeyer

You landed the national retailer. Sales wants to celebrate. Then the purchase order arrives, and the cash leaves your account weeks or months before any of that order turns into a remittance.

A first national retail PO usually asks you to fund slotting, a production run, freight, and inventory on someone else's terms before a dollar comes back. The brands that get through that stretch usually build a 13 week cash flow from books they trust before they talk to a lender, so they can see the gap before deciding how to cover it.

At Teicor we sit inside CPG brands as fractional CFOs and accounting operators. We're not here to sell you a financing product. We want you to know what the order costs in cash, week by week, before you wire the co-man.

Why does a first national retail PO create a cash gap?

The PO looks like revenue on a sales forecast, but in cash it's a string of outflows that all hit before anything comes back.

You pay for ingredients or finished goods. You pay the co-manufacturer if you're not making it yourself. You pay freight into the retailer's DC or the distributor's warehouse. You often pay a slotting fee up front. Meanwhile the invoice sits on net-60 or net-90 (sometimes longer), and the remittance that arrives may already be short once deductions land.

That timing problem is close to what we wrote about in Q4 load-in cash, where inventory hits before revenue. The first national PO is the same squeeze, usually bigger, because the door count feels like a win and the cash plan hasn't caught up.

If you only watch the PO value and the ship date, you'll fund the order and then wonder why payroll and the next promo window feel tight in the same month.

What belongs in a 13 week cash flow before you fund the order?

A 13 week cash flow is a weekly view of cash in and cash out for the next quarter. For a first national PO, build it before you commit production, not after the first invoice is sitting unpaid.

Start from clean books. If AR, inventory, and trade accruals are messy, the forecast will inherit that mess. You need opening cash and open AP you believe, plus a read on what's already committed for the next few weeks (payroll, rent, ingredients, freight).

Then put the PO on the calendar as a series of dates, not as one number:

  1. Cash out for production or finished-goods receipts (week by week as deposits and balances hit).
  2. Cash out for inbound freight and any DC fees.
  3. Cash out for slotting or placement when the invoice is due, not when Sales closed the deal.
  4. Cash in for the remittance on the terms you actually have, not the terms you hope for.
  5. A haircut on that remittance for the deductions you can already price from the deal sheet.

Keep the sales forecast and the cash forecast separate. Shipments can look strong while cash is still leaving. If this order pulls the next production run forward, our inventory strategy post pairs well with this one.

Say the PO is $200,000 at your case price. Production and ingredients might take $90,000 over three weeks. Freight might take another $8,000. Slotting might take $25,000 due before the first ship. If the retailer pays on net-90 and you ship in week 4, the remittance may not land until around week 17, outside a 13-week window unless other cash is coming in. That $200,000 PO can leave you funding more than $120,000 of outflows with no matching inflow in the quarter you're staring at.

How do slotting fees and a slotting allowance change the cash plan?

Slotting fees are what many retailers charge to put your SKU on the shelf or in the planogram. A slotting allowance is the same family of cost, often framed as an allowance the brand funds so the retailer makes space. Either way, you're paying for access before you've sold a case through that door.

Founders sometimes treat slotting as a one-line marketing cost and move on. In cash, the timing matters as much as the amount. If the fee is due before first ship, it sits in the same weeks as production deposits. If it's deducted from early remittances, your first cash back is smaller than the invoice. Both versions belong on the 13 week cash flow as real dates.

Ask Sales and the buyer for the due date, the payment method (separate invoice vs remittance deduction), and whether the fee is refundable if the item exits. Put the answer on the weekly grid. If nobody can tell you when the cash leaves, you don't yet know the door's cash cost.

Slotting also tends to travel with reset fees, new-item paperwork charges, and opening-order freight. Bundle those on the same rows so a second invoice doesn't surprise you.

When does purchase order financing make sense for a CPG brand?

Once the 13 week cash flow shows a gap you can't cover with operating cash, you can weigh how to fund it. Purchase order financing is one option: a lender advances against a verified PO so you can pay the manufacturer, then gets repaid when the customer pays. Inventory lines, AR lines, and equity are other options.

Purchase order financing tends to fit when the PO is real, the customer is creditworthy, and the gap is tied to that order. It gets expensive when the PO is soft, the ship window keeps moving, or deductions will shrink the remittance in ways the lender didn't underwrite.

An inventory or AR line can fit better when you already fund receivables and turns, and this PO is one more layer on that pattern. Equity can be cleaner when the gap is a growth step-change you expect to repeat.

Erin Wall, President of Lunr Capital, sees this from the lender side. Lunr does inventory financing for consumer brands moving into retail, and when I asked her about timing, she said the funding conversation should start earlier than most founders think:

"Before you walk into a retailer, you should already know how many doors you can really stand behind, and how you're going to fund it. Talk to inventory financers before your retail meeting."

Erin Wall, President of Lunr Capital

I also asked what she wants to see before a brand comes to Lunr. Her list was proof of consumer demand, product that's already selling, pricing and packaging worked out, about a year in business, and clean financials in QuickBooks. That's the same groundwork a 13 week cash flow needs, so if you've built one, you'll walk into the lender call with most of it ready.

The decision order matters more than the product name. Build the weekly cash view first. Price the gap in dollars and weeks. Then compare each option's cost against what that cash unlocks. If the books can't support a lender conversation yet, fix the books before you shop term sheets.

How do payment terms and deductions shrink what comes back?

Even a fully funded PO can disappoint when the remittance arrives. Longer terms push cash outside the window you planned, and deductions take a bite out of the invoice you thought you'd collect.

If the retailer or distributor is asking for net-90 or longer, treat that as part of the funding question even if Sales brings it up as a side note. We walk through why those terms are a loan you're making in Net 90 Payment Terms Are a Loan to the Retailer. Read that one when a buyer asks to stretch terms.

Deductions after the first ship are the other leak. Promos, shortages, damages, and chargebacks can land on the same remittance that was supposed to refill your cash. Gross-to-net without the distributor mythology maps invoice to cash. If the first PO calendar includes a manufacturer chargeback, read why a manufacturer chargeback is not 10% of the case price before you budget the promo haircut off your case price alone.

Erin flagged margin as the place founders get caught at this stage:

"The most common mistake we see is founders not really understanding their product margin. Make sure your margins can live beyond your first retailer and withstand chargebacks and retailer terms."

Erin Wall, President of Lunr Capital

Put a planned deduction rate on the cash forecast for that customer. Update it when the first remittance teaches you something. Planning on a clean check usually leaves you short.

What should you decide before you accept the ship window?

Before you lock production and freight, answer these from the 13 week cash flow:

  1. How much cash leaves before any remittance arrives, and in which weeks?
  2. What are the slotting fees (or slotting allowance) and when are they due?
  3. What payment terms are on the PO, and when does that put cash in?
  4. What deduction haircut are you willing to assume on the first remittances?
  5. If there's still a gap, which funding path are you choosing on purpose, and what does it cost?

If you can't answer those, negotiate timing, order size, ship windows, or terms until the grid works, or bring in financing with eyes open. That way the first national retailer still feels like a win after the ship date.

If you've got a PO in hand and the weekly cash view still feels fuzzy, I'd love to walk through it with you. Reach out through our contact page and tell us the ship window and the terms on the order. If it's easier to pick a time, you can book a call on my calendar.


FAQ

What is a 13 week cash flow for a CPG brand funding a retail PO?

It's a week-by-week forecast of cash in and cash out for the next 13 weeks. For a first national PO, include production deposits, freight, slotting, operating bills, and remittance timing on the terms you actually have.

Are slotting fees the same as a slotting allowance?

They're in the same family. Both are costs you fund so the retailer makes shelf or planogram space. The label matters less than the due date, the amount, and whether the cost is a separate invoice or a remittance deduction.

Should I use purchase order financing for my first national retail PO?

Only after the 13 week cash flow shows a gap you can't cover with operating cash, and only if the PO, customer, and ship window are solid enough to underwrite. Compare it to inventory or AR lines and equity on cost and flexibility.

Why isn't the PO value the same as the cash I'll collect?

Because you fund production, freight, and often slotting before you're paid, and the remittance can arrive on long terms with deductions already taken out. The PO value is the starting invoice. Cash is what's left after timing and haircuts.